SCREEPS CONTROLLER TOOL
Controller Downgrade and Upgrader Planner
Turn a live Controller snapshot into a readable safety margin and Upgrader throughput estimate. Model WORK parts, upgrade Boosts, effective uptime, RCL8 limits, and optional OPERATE_CONTROLLER capacity.
INPUTS
Room and upgrader assumptions
BOUNDARIES
Keep the Controller snapshot separate from the plan
The tool does not assume that an Upgrader reaches the Controller, receives Energy, or successfully submits an upgrade intent every tick. Use the effective-upgrading percentage to represent the full delivery and movement system.
Wall-clock time is only an estimate because Screeps tick duration changes with server load. Treat the live ticksToDowngrade value as the source of truth.